The Current Faber Systems Construction
Raw ledger · all contributions

Raw flows

The records under the stories. Every contribution exactly as filed — source, target, amount, date, type, and the filing it came from. 1 rows. · Filtered to Faber Systems Construction
DateSourceTargetAmountTypeFiling
2026-04-08 Faber Systems Construction Bailey For Illinois $200.00 donation
The Current · raw flows scope · CA · 1 Apr 2025 – 30 Jul 2028 · ingested 25 Aug 2026 source · CalAccess · every row traces to a filing